Aspose.Tasks for Java のリリース
Released: Sep 30, 2024
V24.9 での更新項目
機能
- Added support for rendering RectangleBottom, LineMiddle, LineTop task bars middle shapes.
- Added TaskUid to TaskValidationException.
不具合の修正
- Fixed issue where indents are included to task names when rendering bar texts in Gantt chart.
- Fixed calculation of assignments peak units.
- Fixed calculation of ActualDuration and Duration by work for resource assignments with non-flat work contour.
- Added baseline bars rendering in Gantt chart.
- Fixed rendering of Gantt chart bars.
- Resource Usage Actuals...
Released: Aug 28, 2024
V24.8 での更新項目
機能
- Implemented RescheduleUncompletedWorkToStartAfter logic for cases when Project.SplitsInProgressTasks is false.
不具合の修正
- Fixed differences in dates after using RescheduleUncompletedWorkToStartAfter in Aspose.Tasks and in MS Project.
- Fixed calculation of Stop/Resume properties for tasks.
- Fixed calculation of ActualDuration, Duration and Finish for summary tasks.
Released: Jul 30, 2024
V24.7 での更新項目
機能
- Added an API to get the project's names to PrimaveraBaseReader.
不具合の修正
- Fixed order of project import when importing default projects from XER file containing several projects.
- Fixed calendar reading from XER format: project's MinutesPerDay, MinutesPerWeek, DaysPerMonth are taken from non-default calendar.
- Fixed exception when MPP9 file is saved after resource leveling.
- Fixed "An entry with the same key already exists" when reading resource rates from XER file.
- Fixed reading of Baseline...
Released: Jun 28, 2024
V24.6 での更新項目
機能
- Implemented resource leveling.
不具合の修正
- Timephased data of assignment with Contoured work contour is not changed when parent task's start is changed.
- Fixed reading of calendar for the specific file.
- Fixed exception when reading Global MPT template file.
Released: May 24, 2024
V24.5 での更新項目
不具合の修正
- Fixed Asn.WorkVariance calculation.
- Fixed generation of timephased data when load's change is aligned with weekends.
- Fixed issue where task split by Aspose.Tasks is displayed as three-parts in MS Project.
Released: Apr 18, 2024
V24.4 での更新項目
機能
- You can now remove rounding when reading Asn.Units from MPP.
- Enhanced the usability of exporting to CSV format.
不具合の修正
- Fixed incorrect work of material assignment shown by MS Project when project.WorkFormat is set to TimeUnitType.Day.
- Fixed setting PageInfo.Legend.LegendOn is not applied when project is rendered.
- Fixed incorrect writing of zero duration tasks which can lead to incorrect dates shown when project is recalculated in MS Project.
Released: Mar 22, 2024
V24.3 での更新項目
不具合の修正
- Fixed reading of MPP file with non-standard structure saved by MS Project version 16.0.16924.20150.
- Fixed reading of task and resource Guids from XML format.
- Fixed empty Assignments guids when project is saved to MPP and XML repeatedly.
- Fixed calculation of the dependent properties when task PercentComplete is set to 100%.
- Fixed inability to set ActualFinish for tasks with zero duration.
- Export to MPP and XML return different results.
Released: Mar 1, 2024
V24.2 での更新項目
機能
- Add the ability to set 'IsPortrait' in save options.
- Add limitation to length of 'Filter.Name' property.
不具合の修正
- Fixed incorrect reading of time-phased data for specific file.
- Error writing interval filter criteria with values containing field reference.
- Error writing 'Filter.ShowRelatedSummaryRows' flag to MPP file.
Released: Jan 31, 2024
V24.1 での更新項目
機能
- Added the ability to write Task and Resource Filters for MPP14+ formats.
不具合の修正
- Filters added via Aspose.Tasks are not displayed correctly when opened by Microsoft Project.
- Existing graphical indicators are not preserved when MPP is opened and then saved by Aspose.Tasks.
- Fixed reading and writing of ExternalTaskId and ExternalTaskUid.
- Extra empty resource is shown when opening MPP9 file.
- Fixed incorrect calculation of Rsc.CostVariance for the specific versions of MPP files.
Released: Dec 21, 2023
V23.12 での更新項目
機能
- Added validation that checks if calendar names are unique.
不具合の修正
- Fixed performance degradation when saving the specific project to XML.
- Fixed costs and duration rounding when reading a project from MPP and XML.
- Fixed ArgumentOutOfRangeException when trying to get Task.Status for the specific project.
- Incorrect formula's field arguments are saved to XML format in some cases.
- View.BarStyles are not shown in MS Project when opening MPP saved by Aspose.Tasks.
- Microsoft Project 2003 crashes when...